  • ASTW’s installation and service teams, counting up to 15 trained technicians have done extensive work at rendering plants in Australia during the past year 2023/2024.
  • Note that ASTW is the only supplier that include installation with supply of dryers, cookers, presses and accessories, and service of worn components.

After extensive visiting we see that many rendering plants in Australia and New Zealand are in need of repair and upgrading. It will benefit your operation to contact ASTW and discuss plans, layouts and options.

  • Complete rendering plants, high temp and low temp
  • Main components: disc dryers, disc cookers, pre-heaters, twin screw presses, accessories, screw conveyors, container loader and more.
  • See our reference list in Australia and New Zealand.

SEE YOU AT THE ARA SYMPOSIUM 2024 – ASTW booth

Case 1

  • Supply and installation of 170 meters raw material screw conveyors indoor and outdoor from condeem room to rendering plant. Includes ladders and walkways.
  • Significantly reducing transport cost and eliminating manual labour.
  • Installation work by 8 ASTW’s technicians was completed within 21 days.
  • Supply, installation and commissioning of high temp disc cooker TST 240 m2

Case 2

  • Repairing, maintaining and reconditioning ASTW 10-year-old 450 m2 disc dryer, press and accessories.
  • It is critical for customer to not stop processing, so keeping the rendering plant running smoothly is vital.
  • ASTW team will be working over shutdown period during Christmas 2024 and New Years holiday.
ASTW Dryer

CASE 3:

  • Supply and installation of 180 meters raw material screw conveyors. Includes ladders and walkways.
  • New screws are installed underneath the kill floor, collecting byproducts from every trimming station and transporting them to the nearby rendering plant.
  • Fully automatic system including CIP “Cleaning in Place”
  • Significantly reducing transport cost and eliminating manual labour.
  • Installation work by 14 ASTW’s technicians was completed within 12 days.
  • Supply, installation and commissioning of high temp disc cooker TST 200 m2

Case 4

  • Supply and install cooker, dryer and accessories on existing rendering plant to increase capacity.
  • A team of 10 ASTW’s technicians installed the machines while the plant is running and change over to the new machinery over the weekend avoiding any downtime for customer.
  • Installation work was completed within 30 days across two locations.
Rotor

Case 5

  • Repairing, maintaining and reconditioning 20-year-old ASTW TST 300 m2 disc cooker.
  • ASTW team will also conduct a full analysis of the rendering plant and providing reports to customer explaining the current condition of the plant and suggesting solutions to keep the plant fully optimum.
  • 5 ASTW’s technicians will take 7 days to complete the job.

Case 6

  • Supply and installation of new disc dryer TST 450 m2
  • Also refurbishing old dryers and maintaining old accessories.
  • A team of 6 ASTW’s technicians will be onsite for 45days.